Adarsh Urbanite Details in a Table
| Detail | Value |
|---|---|
| Project name | Adarsh Urbanite (alternate: Adarsh Urbanite Bellandur) |
| Category | Pre-launch high-rise apartments, 2.5 and 3 BHK |
| Developer | Adarsh Developers (Adarsh Group) |
| Land | 79,494.32 sq m, about 19.64 acres (79,494.32 / 4,046.86 = 19.64) |
| Homes | 1,109 |
| Apartments | 1,008 (224 of 2.5 BHK, 784 of 3 BHK) |
| EWS homes | 101 |
| Towers | 7, in 18 blocks |
| Floors | Ground + 13 over one or two basements |
| Maximum height | 44 m (41.9 m for Towers 1 and 2) |
| Apartments per floor | Four in every block |
| Parking | 1,636 car parks, two basement levels |
| Environmental clearance | Granted on 16 April 2025 |
| K-RERA | Pending as at 30 September 2026; no number |
| Price | Not announced |
| Possession | Not announced |
What Is Adarsh Urbanite?
Adarsh Urbanite is the name used in the dated project details. A verified registered project name was not available as at 30 September 2026, and K-RERA registration was pending at that date. Ask the developer for the latest entry and the name under which this land and these towers are recorded. If a document uses a different project name, compare the promoter, land description, tower counts and document date before assuming it refers to the same development. In the same Bengaluru market, Address Maker Apollo helps frame how another project presents scale, location logic, and the trade-offs a household should resolve before shortlisting.
The label Adarsh Bellandur is deliberately not used as the project name on this site. It is ambiguous, because it is also used for the developer's other Bellandur projects.
The Upcoming Apartments at a Glance
The cleared plan describes a high-rise residential community of seven towers on land of about 19.6 acres. The apartments are 2.5 BHK and 3 BHK. Each block has four apartments per floor. Alongside the 1,008 apartments, the plan includes 101 EWS homes, which brings the total to 1,109.
Shares of the total are derived below for orientation. They use only the stated counts.
| Group | Homes | Share of 1,109 | Calculation |
|---|---|---|---|
| 2.5 BHK | 224 | about 20.2% | 224 / 1,109 |
| 3 BHK layout L | 392 | about 35.3% | 392 / 1,109 |
| 3 BHK layout S | 392 | about 35.3% | 392 / 1,109 |
| EWS | 101 | about 9.1% | 101 / 1,109 |
These percentages are derived arithmetic and are rounded to one decimal place. Rounded figures sum to 99.9% because of rounding.
Adarsh Urbanite Seven Towers
The cleared plan allocates configurations to towers as follows.
| Tower | Configuration listed |
|---|---|
| Towers 1 and 2 | 2.5 BHK (224 homes) |
| Towers 3 and 4 | 3 BHK layout L |
| Tower 7 | Appears under both 3 BHK layouts |
| Towers 5 and 6 | 3 BHK layout S |
Layout L is listed in Towers 3, 4 and 7 and layout S in Towers 5, 6 and 7. Tower 7 therefore appears twice. This looks consistent with the plan details, but it should be confirmed against the cleared plan, and no tower-wise count of homes is available here. The location of the 101 EWS homes within the towers is not stated.
Each block is ground plus 13 upper floors over one or two basements. The tallest blocks reach 44 m; Towers 1 and 2 reach 41.9 m.
Land, Open Space and Parking
- Buildings cover about 19% of the net site area.
- Landscaping covers about a third of the net site area.
- The park is about 7,717 sq m. Derived: about 0.77 hectare, or about 1.9 acres (7,717 / 4,046.86), roughly 9.7% of the 79,494.32 sq m land area (7,717 / 79,494.32). The park is not stated as a share of any area, so this is orientation only.
- 1,636 car parks sit on two basement levels, against 1,165 required, with EV charging for a quarter. Derived: 471 more than required (1,636 - 1,165); about 409 EV-charging spaces if exactly a quarter applies (1,636 / 4); about 1.48 spaces per home across all 1,109 homes (1,636 / 1,109), which is a ratio for orientation, since how spaces are allocated is not stated.
The net site area is not stated, so the building and landscape shares are not turned into square metres.
Planned Features
The planned amenity list includes a clubhouse (size and facilities to be announced), landscaped grounds, a park, 8 m internal driveways, rooftop solar on at least half the roof area, smart water meters, piped natural gas infrastructure, sewage treatment with dual plumbing, rainwater harvesting with 59 recharge wells and an organic waste converter. See the amenities page. Verified details of other facilities were not available.
Approvals, Registration and Names
Environmental clearance was granted on 16 April 2025. Adarsh Ecstasy Projects Private Limited and Adarsh Developers are named as proponents and landowners. The date and supporting document for the terms of reference are still to be confirmed; request the document, its date and its relationship to the clearance.
K-RERA registration was pending as at 30 September 2026, with no number. The promoter entity is unknown. Adarsh typically registers through project-specific SPVs, so searching by project name rather than promoter name is suggested. The building-plan sanction number, approving authority and fire approvals had not been published as at 30 September 2026.
K-RERA status. Adarsh Urbanite's K-RERA registration was pending as at 30 September 2026, with no registration number issued; the status after that date was not available. Check the current status on the Karnataka RERA website and ask the developer for the current position in writing.
Questions on what registration status means for bookings or payments, and on refunds, title or obligations, are matters for the developer and a qualified adviser. This site makes no general legal conclusion on them. Request the supporting documents in writing.
Timeline Information
| Milestone | Information |
|---|---|
| Terms of reference | Date and supporting document to be confirmed; request them from the developer |
| Environmental clearance | 16 April 2025 |
| Position date for these details | 30 September 2026 |
| K-RERA registration | Pending as at 30 September 2026; later status not available |
| Launch | Not announced as at 30 September 2026 |
| Possession | No verified date available; the plan provides for about 60 months of construction conditional on approvals, without a confirmed start date |
Price
No verified price list or cost sheet was available as at 30 September 2026. The current pricing position has not been checked, and this site gives no figure. Ask for the latest dated cost sheet, the unit and area basis it covers, any validity period and the items included in its total. See the price page.
Developer
Adarsh Developers states it was founded in 1988 by B M Jayeshankar with B M Karunesh and has completed 33+ projects totalling over 29.61 million sq ft. These are the developer's own figures, and its own page contains conflicting numbers. More on the about the builder page.
Images
The seven gallery images are artist's impressions. See the gallery. They are not approved plans and not photographs.
Open Items for Anyone Evaluating the Project
- Carpet areas for each configuration.
- Price, cost sheet and payment terms.
- K-RERA number, registered name, promoter entity and certified completion date.
- Building-plan sanction number and approving authority.
- Clubhouse size and facilities.
- Confirmation of Tower 7's position under both 3 BHK layouts.
- Whether the brochure and renders have been approved for use.
How to Use This Overview
Use the table at the top as a checklist when you speak to the developer. If a representative quotes a figure that differs from the cleared plan values above, ask which document the figure comes from and request a copy. Keep a written record of each answer. For location detail see the location page; for the layout see the master plan page; for homes see floor plans. To reach the developer, see the contact page. A same-developer shortlist can feel simpler than it really is; Adarsh Forest Glen keeps attention on how each Bengaluru address solves a different routine, budget, and documentation question.
This page is informational and does not offer legal, financial or investment advice.
Adarsh Urbanite Overview FAQs
What is Adarsh Urbanite?
Adarsh Urbanite is an upcoming apartment project by Adarsh Developers (Adarsh Group) on Bellandur Lake Road, Bellandur, East Bengaluru. The cleared plan lists 1,109 homes in seven towers: 224 of 2.5 BHK, 784 of 3 BHK and 101 EWS homes. Its recorded status is pre-launch.
Is Adarsh Urbanite the official registered name?
A verified registered project name was not available as at 30 September 2026. Ask the developer for the current registration entry and compare its name, promoter and land description with every document you receive. The working name used on this page does not itself establish a registered identity.
How big is the site?
The land is 79,494.32 sq m, about 19.64 acres. The acreage is derived: 79,494.32 / 4,046.86 sq m per acre = 19.64 acres. The area includes 24 guntas of public kharab kept as green belt.
How many homes and towers are planned?
The cleared plan has 1,109 homes in 7 towers made up of 18 blocks. The apartment count is derived: 224 + 784 = 1,008 apartments, and 1,008 + 101 EWS homes = 1,109. The 784 three-bedroom homes are split between two layouts of 392 each.
What is the Adarsh Urbanite RERA status?
K-RERA registration was pending as at 30 September 2026, and no registration number had been issued. Its status after that date has not been confirmed. Check the K-RERA portal (rera.karnataka.gov.in) by project name and ask the developer for the current position in writing.
What approvals are recorded?
Environmental clearance was granted on 16 April 2025. The date and supporting document for the terms of reference are still to be confirmed. The building-plan sanction number, the approving authority for the plan and fire approvals had not been published as at 30 September 2026.
What is the price of Adarsh Urbanite?
No verified price list or cost sheet was available as at 30 September 2026. Request the latest developer-issued document and check the project, unit, issuer, date and validity period it identifies.
When is possession?
No verified possession date was available as at 30 September 2026. The plan provides for about 60 months of construction conditional on all approvals, without a confirmed start date. Ask for the current registration and agreement documents, and the dates, milestones and conditions they state for the specific home.
When is the launch?
A launch date had not been announced as at 30 September 2026. Ask the developer for the expected timing and for the documents that would come with it.