The list below is a baseline for questions, not a site inspection, brochure, sanctioned plan or registered specification. Details may have changed since 30 September 2026, so re-check anything you rely on with the developer. Address Maker Apollo is useful because amenity value depends on how often residents will use the facilities, how they are maintained, and whether the operating cost feels justified.
Planned Amenities at a Glance
| Amenity or feature | Detail in the project plan |
|---|---|
| Clubhouse | Size and facilities to be announced |
| Landscaped grounds | Trees and lawns on about a third of the net site area |
| Park | About 7,717 sq m |
| Internal driveways | 8 m |
| Basement parking | 1,636 cars |
| EV charging | A quarter of the parking |
| Rooftop solar | At least half the roof area |
| Smart water meters | Every home |
| Piped natural gas | Infrastructure |
| Sewage treatment | Plants with dual plumbing |
| Rainwater harvesting | 59 recharge wells |
| Organic waste converter | Listed |
The environmental clearance for Adarsh Urbanite was granted on 16 April 2025. Request the relevant pages of the clearance and ask which listed items are conditions, which are additional proposals, and what current specifications support each one.
How to read this list
Three practical points follow for anyone assessing the proposal.
First, the wording is generic in places. “Infrastructure” for piped natural gas, or “Listed” for the organic waste converter, shows that an item is intended but not how large it is, where it sits or who runs it.
Second, some items are expressed as proportions, such as a quarter of the parking or at least half the roof area. A proportion gives scale but is not a specification: it does not say how many chargers, how many kilowatts or which roofs.
Third, nothing here goes beyond the position as at 30 September 2026. If the developer has issued a brochure or a registration filing since then, that material should take precedence once you have seen it.
Adarsh Urbanite Clubhouse
The plan includes a clubhouse, and its size and facilities are to be announced. The gallery image captioned “Adarsh Urbanite clubhouse, artist's impression.” is an illustration, not a photograph or an approved plan. This page names no clubhouse facility such as a gym, pool, indoor games room or hall, because verified evidence of facilities was not supplied.
Questions to put to the developer:
- What is the clubhouse built-up area, and where on the plan is it?
- Which facilities will it include, and will any be chargeable?
- When will the clubhouse be completed relative to the towers?
- Who will operate and maintain it?
- Is it intended for all 1,109 homes, including the EWS homes, or for a subset of towers?
The last question matters because the project is seven towers in 18 blocks, and a single clubhouse serving a large community raises ordinary questions about capacity and access. The record does not say how access is arranged, and this page assumes no answer. To compare outdoor and shared-space planning with Adarsh Urbanite, consider Prestige Oakville, which is an upcoming Prestige project of 226 three- and four-bedroom homes in Koramangala 1st Block.
Adarsh Urbanite Park
The park is about 7,717 sq m. For orientation, that is about 1.9 acres and about 9.7% of the 79,494 sq m land area (derived: 7,717 / 79,494). The land area includes 24 guntas of public kharab kept as green belt. It is not stated whether the park counts within the landscaped area of about a third of the net site area, so the two figures are not added together here.
The gallery image captioned “Adarsh Urbanite park, artist's impression.” shows lawns and trees beside a planted drain buffer. The plan describes a primary storm-water drain along the southern edge with a 50 m buffer and tertiary drains across the site with 15 m buffers. A verified park position was not supplied in an approved drawing.
Questions worth asking:
- Can you share the park's boundary on the master plan and its relationship to the 50 m and 15 m drain buffers?
- Which parts of the park are intended for walking, play, seating or planting, and which are buffer or green belt?
- How will the park be maintained, and by whom?
Landscaping and Open Space
Buildings cover about 19% of the net site area and landscaping about a third. The landscaped grounds are of trees and lawns. The gallery image captioned “Adarsh Urbanite gardens between the towers, artist's impression.” shows landscaped gardens and walking paths between the towers, but path lengths, play areas, seating and tree species were not supplied.
The net site area is not given as a number, so this page does not convert “about a third” into square metres. If the developer provides it, you can calculate the landscaped area yourself and compare it with the park figure. Ask whether the landscaped area includes the drain buffers and the green belt, because that changes how usable the open space is day to day.
The plan also lists 8 m internal driveways. Their position relative to the landscaped areas, and whether any are intended to be pedestrian-priority, were not supplied.
Parking and Mobility
The plan provides 1,636 car parks on two basement levels against 1,165 required, with EV charging for a quarter of them. Derived: 471 more than required (1,636 − 1,165), and about 409 EV-charging spaces if exactly a quarter applies (1,636 / 4). The second figure is an estimate from a rounded proportion, not a published count.
Charger types, power ratings and who pays for charging were not supplied. Visitor parking, two-wheeler parking and loading areas are not described in the supplied material. The number of car parks allotted to each home, whether parking is sold or included, and how spaces are assigned were also not supplied. These are questions for the developer and the sale documents once they exist.
A further orientation figure: with 1,008 apartments plus 101 EWS homes, 1,109 in all, 1,636 car parks works out to about 1.48 per home (derived, 1,636 / 1,109). This is only an arithmetic average. It does not say how parking is allotted, whether EWS homes receive spaces or whether visitor spaces are counted within the 1,636, so do not read it as an entitlement.
Water, Waste and Energy Features
| Feature | What is planned | Not supplied |
|---|---|---|
| Rooftop solar | At least half the roof area | Capacity in kilowatts, what loads it serves |
| Smart water meters | Every home | Metering and billing details |
| Sewage treatment | Plants with dual plumbing | Plant capacity; arrangement of recycled water use beyond dual plumbing |
| Rainwater harvesting | 59 recharge wells | Storage capacity and how recharge is monitored |
| Organic waste converter | Listed | Capacity and operating model |
| Piped natural gas | Infrastructure | Supplier and connection terms |
These are infrastructure items rather than lifestyle amenities, but they affect running costs and day-to-day living. Ask the developer who owns and maintains them after handover and how the cost is shared. This site gives no legal view on obligations; those questions are for the developer and a qualified adviser.
Practical points to raise when you see more documentation:
- Dual plumbing implies separate supply lines for recycled water, according to the record's reference to recycled water for flushing. Ask what the recycled water is used for in practice and how its quality is monitored.
- Rooftop solar on at least half the roof area is a proportion. Ask for the installed capacity and whether it serves common areas, individual homes or both.
- Smart water meters in every home raise a billing question: who reads them, and how are common-area and household use separated?
- 59 recharge wells is a count. Ask how they are distributed across the 18 blocks and the open areas.
Environmental Context
The site lies across Bellandur Lake Road from Bellandur Lake, to the west. Ask which flood and drainage precautions the documents specify, how they relate to the one or two basement levels under each block, and where those measures appear on the sanctioned plan. The location page gives the buffer figures and further questions.
Drain buffers feature in this project's plan, so a buyer may reasonably want to see how the buffers are shown on the sanctioned drawings.
Amenities Not Yet Described
The record does not list amenities such as a swimming pool, gymnasium, sports courts, a children's play area, a multipurpose hall, retail, security systems, power backup, lifts per tower or visitor facilities. Verified evidence for them was not supplied. If a facility matters to you, ask for it in writing and for the document that states it. Do not assume that a facility seen at another Adarsh project will be repeated here; each project's documents stand on their own.
| Item | Status |
|---|---|
| Planned items above | Listed in the project plan; not verified on site |
| Clubhouse facilities | To be announced |
| Any additional amenities | Verified evidence not supplied |
| Completion dates for amenities | Not announced in the 30 September 2026 record |
| Building-plan sanction and approving authority | Not published as at 30 September 2026 |
| K-RERA registration | Pending as at 30 September 2026; no number issued; re-check before use |
| Images | Artist's impressions only |
Questions to Ask About Amenities
- Can you provide the list of amenities that will form part of the registered project, with sizes and locations?
- How is the clubhouse's specification to be confirmed, and when?
- Which amenities are conditions of the environmental clearance, and which are additional?
- Will any amenity be shared with other developments?
- What maintenance arrangements and charges are planned, and who sets them?
- What is the sequence of completion of amenities relative to the towers?
- Which sustainability systems will be handed over, and to whom?
- Can you share the master plan showing the park, clubhouse, drain buffers and landscaped areas, and say whether it is the sanctioned plan?
- Where will the registered amenity list be published once registration is complete, and which promoter entity will appear on it?
- Are the images used on this site and elsewhere approved by the developer, and which are illustrative only?
On the ninth question: Adarsh registers most projects through project-specific special purpose vehicles, so the promoter named on a registration may not contain the word Adarsh. The promoter that will register this project is unknown. When registration documents appear, check that the entity named there is the one named in any agreement offered to you, and take a qualified adviser's view if you are unsure.
Using the amenity information
It helps to separate three things: what the plan lists, what an illustration suggests, and what a registered or sanctioned document commits. This page covers the first and notes the second. For the third, ask for the sanctioned plan and registration documents once available.
A simple test for each amenity: is it named in a document you can read, is its size or capacity stated, is its location shown on a plan, and is its upkeep explained? On the present evidence the park has a stated size, the parking has a stated count, and the recharge wells have a stated count. The clubhouse has none of these, and the solar, gas and waste items have only a general description. That is an observation about the evidence supplied, not a judgement about what will be built.
The gallery page explains the illustration captions, and the master plan page summarises the open-space figures. The price page lists questions about amenity charges and the cost sheet. No verified current price, carpet area, launch date or possession date was supplied, so none is stated here. This page is informational only.
Adarsh Urbanite Amenities FAQs
What amenities are planned?
The plan lists a clubhouse (size and facilities to be announced), landscaped grounds on about a third of the net site area, a park of about 7,717 sq m, 8 m internal driveways, electric-vehicle charging, rooftop solar on at least half the roof area, smart water meters for every home, piped natural gas infrastructure, sewage treatment with dual plumbing, rainwater harvesting with 59 recharge wells and an organic waste converter. No other amenity has been confirmed as at 30 September 2026.
What parking is planned?
The plan provides 1,636 car parks on two basement levels, against 1,165 required, with electric-vehicle charging for a quarter of them. The margin is derived: 1,636 - 1,165 = 471 spaces. How spaces will be allotted to homes was not available as at 30 September 2026.
Are the images actual photographs?
No. All seven gallery images are artist's impressions. They are not verified photographs or approved plans, and they should not be used to judge finishes or layouts.
What is Adarsh Urbanite?
Adarsh Urbanite is an upcoming apartment project by Adarsh Developers (Adarsh Group) on Bellandur Lake Road, Bellandur, East Bengaluru. The cleared plan lists 1,109 homes in seven towers: 224 of 2.5 BHK, 784 of 3 BHK and 101 EWS homes. Its recorded status is pre-launch.
How big is the site?
The land is 79,494.32 sq m, about 19.64 acres. The acreage is derived: 79,494.32 / 4,046.86 sq m per acre = 19.64 acres. The area includes 24 guntas of public kharab kept as green belt.
What is the Adarsh Urbanite RERA status?
K-RERA registration was pending as at 30 September 2026, and no registration number had been issued. Its status after that date has not been confirmed. Check the K-RERA portal (rera.karnataka.gov.in) by project name and ask the developer for the current position in writing.